# Skip Task(s)

| ![](https://cdn-assets.productfruits.com/5b4a7650-0b61-4a6a-9deb-92940393cfb8) | **Note:** Skipping a task(s) works slightly differently from skipping copy tasks. For details on skipping copy tasks, refer to [**Skip Copy Task(s)**](https://help.manageartworks.com/en/article/skip-copy-tasks). |
| --- | --- |

You can skip a task at any time—before or after the project starts—if it is not required for that specific project.

| ![](https://cdn-assets.productfruits.com/cb77f884-6b41-4231-aa70-1e832e70a9d6) | **Note:**<br>-   To skip the current active task, refer to [Edit Current Activity](https://help.manageartworks.com/en/article/edit-current-activity).<br>-   For **In-progress** projects, a task can be skipped by:<br>    -   The assigned participants<br>    -   The initiators (users assigned to the Start activity).<br>-   For assigned participants to skip a task in an in-progress project, the **Edit Stakeholder** setting must be enabled for that task.<br>-   Before project initiation, initiators can skip tasks. |
| --- | --- |

## To Skip a Task

1.  Log in to your [ManageArtworks](https://app.manageartworks.com/karomi/global/build/login) account.
2.  If you are skipping a task in an in-progress project:
    1.  Navigate to **Project Views**.
    2.  You can skip the task from any view which lists in-progress projects. To switch views, click the hamburger menu and select the desired view.  
          
        ![](https://cdn-assets.productfruits.com/a5fa041e-99b0-4fb7-82fc-e1df04381c6b)  
         
    3.  Open the desired in-progress project and go to the **Tasks** tab.
    4.  In the Skip column, select the checkbox for the task(s) you want to skip. The task name will display with a strike-through.  
        **Note:** If the checkbox is greyed out or disabled, click the **Edit Form** button and then select the checkbox. For assigned participants to skip a task, make sure that the **Edit Stakeholder** setting is enabled for that task.  
          
        ![](https://cdn-assets.productfruits.com/d0087972-f65d-4a38-b32c-2e1df9062b29)  
         
    5.  Click **Save** to skip the task.
3.  If you are skipping a task before project initiation:
    1.  In the project and go to the **Tasks** tab.
    2.  In the Skip column, select the checkbox for the task(s) you want to skip. The task name will display with a strike-through.
    3.  Click **Initiate New Project** or **Save & Close** to skip the task.

![](https://cdn-assets.productfruits.com/2246c7ae-e25e-4ee7-9dca-00bf4fde01d6)